A program is revised to the point that a new CIP code is needed.
SACSCOC and CPE have varying requirements for new program proposals. However, CPE states if a program changes to the point of requiring a new CIP code, then the new program proposal process must be followed. Furthermore, CPE policy states the following Combined Programs and Separated Programs.